Parameters | |
---|---|
Factory Lead Time | 5 Weeks |
Published | 2012 |
Series | Solarlok |
Part Status | Active |
Moisture Sensitivity Level (MSL) | Not Applicable |
Tool Type | Hand Crimper |
Tool Method | Manual |
Ratcheting | Ratchet |
Wire Entry Location | Side Entry |
RoHS Status | Non-RoHS Compliant |